Section No. 3
- Installation of smoke removal ducts: 5th and 6th floors
- Installation of ventilation ducts: 5th-6th floors
- Installation of partition walls made of gypsum plasterboard plates: 5th, 6th floors
- Brick walls of walls and partitions of bathrooms 6th floor
- Installation of metal-plastic window constructions of the 9th and 10th floors
- Installation of partitions from 2NF on the 10th floor
Section 2
- The device of the monolithic parapet for advertising on the roof
- Installation of smoke exhaust ducts: 8th floor
- Installation of ventilation ducts: 7th floor
- Installation of exterior walls and partitions from 2NF on the 10th floor
Section No. 1
- Installation of vertical monolithic structures of the 2nd floor
- The device of the monolithic overlap of the 2nd floor
- Installation of vertical monolithic structures of the 3rd floor
- The device of the monolithic overlap of the 3rd floor
- Installation of vertical monolithic structures of the 4th floor
- The device of the monolithic overlap of the 4th floor
- device of vertical monolithic structures of the 5th floor