House # 1.
1. Installation of metal-plastic window constructions. Floor 1
2. The arrangement of backflood with a layer seal on the axis A.
House # 2.
1. Installation of interior decoration of walls. Floor 1
House # 3.
1. Execution of electrical works.
2. The arrangement of the roof.
House # 4.
1. Execution of electrical works.
2. The arrangement of the roof.
House # 5. v
1. Installation of the facade of the building in axes 1-11, A-B.
2. The arrangement of the sloping layer of the roof.
Buildings # 6 and # 7.
1. Installation of a monolithic b/w of the input group
2. Arrangement of partitions made of gypsum paving slabs. Floor 1
Buildings # 8 and # 9.
1. Installation of the ceiling of the 2nd floor.
Buildings # 10 and # 11.
1. Installation of the overlap of the ground floor.
Buildings # 12 and # 13.
1. The arrangement of the concrete preparation of the plate rafters.
House # 14.
1. Arrangement of the backflow of b/w razverk.
House # 15.
1. The arrangement of the concrete preparation of b/w razverk.