RC «Na Proreznoy-2». Completion of works for March 2020.

House №1 Section №1
1. Arrangement of masonry block 7 floor.
2. Arrangement of masonry block 8 floor.
3. Roof laying.
4. Installation of windows 1 floor

House №1 Section №2
1. Installation of ventilation units 2-8over.
2. Arrangement of PGP partitions 4th floor.
3. Arrangement of partitions with PGP 5 floor.
4. Arrangement of partitions with GWP 6 floor.
5. Arrangement of partitions with PGP 7 floor.
6. Arrangement of partitions with GWP 8 floor

House №1 Section №3
1. Arrangement of vertical elements of 3 floors
2. Flare plate floor 3 floors.
3. Arrangement of vertical elements 4 floors
4. Arrangement of vertical waterproofing of basement walls.
5. Arrangement of the backfill of the sinuses of the pit

House №2 Section №3
1. Arrangement of the floor slab of the basement floor.
2. Arrangement of vertical elements of the 1st floor
3. Arrangement of floor slabs 1 floor.

House №2 Section №2
1. Installation of the pit.

House №2 Section №1
1. Installation of the pit.

×