House № 1
1. Lightning protection device
2. Warming of facade with mineral wool 150 mm thick
3. Facade painting
4. Brick laying of exterior walls on cold transitions 1-7
5. Installation of the frame under the ventilated facade
House №1 p.2
1. Brick laying of exterior walls on cold transitions 1-5
2. Arrangement of input groups
Improvement between house # 1 and the canal
1. Backfilling of basement walls
2. Basement walls insulation
3. Arrangement of the banks of the canal with reinforced concrete piles
4. Vertical soil planning for improvement
5. Arrangement of reinforced concrete piles under the bridge
House №2 p.4
1. Installation of glass windows 1-6 floor
2. Installation of window frames 6-7 floor
3. Brick laying of external and internal walls 4-7 floor
4. Installation of monolithic reinforced concrete parapet
House №2 c3
1. Brick laying of external and internal walls 4-7 floors
2. Installation of monolithic reinforced concrete railings
House № 2s2
1. Arrangement of monolithic reinforced concrete pylons and basement walls
2. Installation of the formwork over the basement
House № 2c1
1. Arrangement of reinforcement editions of the vertical elements of the basement
2. Installation of monolithic concrete pylons and basement walls
House № 8 c3
1. Brick laying of external and internal walls 1-2 floors
2. Installation of monolithic reinforced concrete floor 3 floors
3. Arrangement of monolithic reinforced concrete vertical walls 4 floors
4. Arrangement of monolithic reinforced concrete floor 4 floors
5. Installation of monolithic reinforced concrete vertical walls 5 floors
House № 8 c2
1. Installation of monolithic reinforced concrete vertical walls 2 floors
2. Installation of monolithic reinforced concrete floor 2 floors
3. Installation of monolithic reinforced concrete vertical walls 3 floors
House № 8 s1
1. Installation of monolithic reinforced concrete foundations
2. Backfilling of foundations with layer-by-layer sealing of tampons
3. Installation of monolithic reinforced concrete power plate
House № 10
1. Arrangement of the pit under the pile field
1. Arrangement of a pile field by pressing fields
House № 9
1. Geodetic breakdown of the boundaries for the installation of a ditch
2. Arrangement of the pit under the pile field
Residential quarter of the 1st stage
1. Geodetic layout of the route for the arrangement of external networks
2. Removal of the vegetation layer for the arrangement of external networks
3. Installation of the trough for external networks
4. Storage of pipes of external networks f 225,110,250,400
5. Arrangement of access roads, installation of road plates
6. Dismantling and installation of temporary protection from the construction site decking
7. Installation of concrete pavement for investors