Construction progress on The RC «Riverside» object for the month of June

Residential building №1 section 1
1. Reinforcement of floor slab at mark +11,300
2. Concreting the floor slab at mark +11,300
3. The device monolithic w/b vertical pylons, walls, elevator shaft at mark. +11.300
4. Installation of foresters marches to mark +8.000 (5pcs)
5. The device vertical obmazochnoy waterproofing walls
Residential building №1 section 2
1. Concreting the slab at mark +4.700
2. The device monolithic w/b vertical pylons, walls, lift shaft at mark. +4.700
3. The device formwork monolithic overlap at mark. +8.000
4. Reinforcement of the ceiling at mark +8.000
5. Concreting the floor slab at mark +8.000
6. The device monolithic w/b vertical pylons, walls, lift shaft at mark. +8.000
7. Construction of monolithic reinforced concrete pads up to el. +6.430
8. The device vertical obmazochnoy waterproofing walls
Residential building No. 2, section 4 (16)
1. Reinforcement of walls, pylons, elevator at mark -3.100
2. Concreting of vertical elements of pylons, walls, lift shaft at mark. -3.100
Residential building No. 2, section 3 (15)
1. Backfilling of the grillages with sand and layer-by-layer compaction with vibrorammers
2. The device of concrete preparation under the power plate
3. Reinforcement and concreting of the power plate at mark -3,100
Residential building №8 section 26-28
1. Device test piles
2. Pile Testing
3. Layout of the soil under the construction site of a CAT 434 F2 excavator
First line residential complex
1. Device access roads CAT 434, installation of road plates, device wells for water

×