The list of work performed at the Royal Park facility November 2019

Section № 2
• Brick wall enclosure structures and ventilation shafts.
• Exterior cladding and inside. 2NF brick walls on the 3rd floor.

Section № 1
• Exterior and interior walls. walls and partitions of brick and groove block on the 4th floor.
• Exterior and interior walls. walls and partitions of brick and groove block on the 5th floor.
• Exterior and interior walls. walls and partitions of brick and groove block on the 6th floor.
• Installation of AirVent 21x62 ventilation units from 3rd to 6th floor.

Section № 3
• Exterior and interior walls. walls and partitions of brick and groove block on the 9th floor.
• Exterior and interior walls. walls and partitions of brick and groove block on the 10th floor.
• Stoning inside. partitions of brick and groove block on the 3rd floor.

×