House No. 1.
1. Decorating the entrance group.
2. Installation of cement screed of the first, second and third floors.
3. Finishing a fragment of the facade of the house.
4. Arrangement of the improvement of the territory.
House No. 2.
1. Decorating the entrance group.
2. Arrangement of the improvement of the territory.
House No. 3.
1. Insulation of the entrance group.
2. Arrangement of the improvement of the territory.
House No. 4.
1. Finishing a fragment of the facade of the house.
2. Arrangement of the improvement of the territory.
House No. 5.
1. Arrangement of the stained-glass fence of the entrance group.
2. Arrangement of the ground floor decoration.
House No. 6.
1. Finishing a fragment of the facade of the house.
2. Arrangement of first, second and third floor ties
House No. 7.
1. Arrangement of the stained-glass fence of the entrance group.
2. Installation of laundry rails on terraces.
3. Finishing a fragment of the facade of the house.
Houses No. 8 and No. 9.
1. Installation of metal-plastic stained-glass windows of terraces of the 3rd floor.
2. Installation of laundry rails on terraces.
3. Installation of waterproofing in the bathrooms of the 1st, 2nd and 3rd floors.
4. Preparatory work for the roof arrangement
House No. 10.
1. Installation of laundry rails on terraces.
2. Installation of waterproofing in the bathrooms of the 1st, 2nd and 3rd floors.
House No. 11-13.
1. Preparing for the roof arrangement
Houses No. 14 and No. 15.
1. Arrangement of overlapping of the second floor.
2. Arrangement of the brickwork of the third floor.
House No. 16.
1. Arrangement of the ceiling of the basement floor.
2. Arrangement of the brickwork of the first floor.
House No. 17-18.
1. Arrangement of monolithic reinforcement belt on the walls of the basement floor
Houses No. 19-23
1. Arrangement of the pile field
Houses No. 24-31.
1. Engineering preparation of the territory.