Execution of works for June 2019 by RC «Royal Park»

Section # 3
- Installation of smoke exhaust ducts: 5th and 6th floors
- Installation of ventilation ducts: 5 - 6th floors
- Arrangement of partitions from gypsum groove plates: 5th, 6th floors
- Brick walls and partitions of bathrooms 6th floor
- Installation of metal-plastic window structures of the 9th and 10th floors
- Installation of partitions with 2NF on the 10th floor

Section # 2
- Installation of a monolithic railing for advertising on the roof
- Installation of smoke exhaust ducts: 8th floor
- Installation of ventilation ducts: 7th floor
- Installation of exterior walls and partitions with 2NF on the 10th floor

Section # 1
- Arrangement of vertical monolithic structures of the 2nd floor
- Arrangement of monolithic overlapping of the 2nd floor
- Arrangement of vertical monolithic structures of the 3rd floor
- Arrangement of monolithic overlapping of the 3rd floor
- Arrangement of vertical monolithic structures of the 4th floor
- Arrangement of a monolithic overlapping of the 4th floor
- Arrangement of vertical monolithic structures of the 5th floor

×