Comfort LifeAll newsCourse of constructionFor the period 13.03.18-04.04.18 the following works were performed at the construction site “Proreznaya”

We build a comfortable life

0
1
2
3
4
5
6
7

For the period 13.03.18-04.04.18 the following works were performed at the construction site “Proreznaya”

1. On the house number 1. Completed 100% fence terraces of the upper floors. Completed 100% glazing evacuation balconies. The decoration of the entrance halls and awnings has begun. Installed railing fence staircase number 3. 2. At the house number 2. Completed installation of the elevator in the entrance number 3. The installation of the elevator in the entrance number 2 has been started. 100% of the heating wiring of entrance number 1 has been completed. Completed 85% of basement pit. 3. On the house number 3. Prepared 100% of elevator shafts. Completed 85% of basement pit. 4. At the house number 4. Completed 90% plaster partitions. Installed 50% of windows. 5. At the house number 5. Completed 80% plaster partitions. Started installation of windows 6. At the house number 6 Completed 100% plaster partitions. Installed 40% of windows. The flooring of the basement floor of the kindergarten has been completed. Started laying the first floor of the kindergarten. Completed 100% retaining wall. Started work on the device fountain.

×