Riverside RC Works for February 2020

House № 1 s.1
1. Installation of aluminum frames 5-7 floors
2. Installation of double glazed aluminum windows 5-7 floor
3. Lightning protection device
4. Warming of facade with mineral wool 150mm thick
5. Facade painting
6. Brick laying of partitions 2-7 floors
7. Dismantling of tower crane

  House № 1 s.2
1. Brick laying partitions 2-4 floors
2. Arrangement of input groups

Improvement between house № 1 and the canal
1. Backfilling of basement walls
2. Basement walls insulation
3. Arrangement of the banks of the canal with reinforced concrete piles
4. Vertical soil planning for improvement
5. Arrangement of reinforced concrete piles under the bridge
6. Montach Bridge

House № 2 s.4
1. Installation of glass windows 1-6 floor
2. Installation of window frames 6 floor
3. Arrangement of reinforced concrete monolithic sites 6-7 floors
4. Arrangement of vertical reinforced concrete structures 7 floors
5. Brick laying of external and internal walls 4-7 floors
6. Installation of monolithic reinforced concrete floor 7 floors
7. Installation of monolithic reinforced concrete parapet

House № 2 s.3
1. Brick laying of external and internal walls 2-6 floors
2. Arrangement of monolithic pylons and walls 7th floor
3. Arrangement of monolithic reinforced concrete floor 7 floor B
4. Installation of monolithic reinforced concrete parapet

House № 2 s.2
1. Arrangement of monolithic reinforced concrete pylons and basement walls 2. Installation of the formwork over the basement

  House № 2 s.1 1. Arrangement of reinforcing editions of the vertical elements of the basement

House № 8 s.3
1. Brick laying of external and internal walls 1-2 floors
2. Installation of monolithic reinforced concrete floor 3 floors
3. Arrangement of monolithic reinforced concrete vertical walls 4 floors

House № 8 s.2
1. Installation of monolithic reinforced concrete foundations
2. Backfilling of foundations with layer-by-layer sealing of tampons
3. Installation of monolithic reinforced concrete basement walls
4. Arrangement of monolithic reinforced concrete cellar flooring 5. Installation of monolithic reinforced concrete vertical walls 1 floor
6. Installation of monolithic reinforced concrete floor 1 floor
7. Installation of monolithic reinforced concrete vertical walls 2 floors
8. Installation of monolithic reinforced concrete floor 2 floors

House № 8 s.1
1. Installation of monolithic reinforced concrete foundations
2. Backfilling of foundations with layer-by-layer sealing of tampons
3. Installation of monolithic reinforced concrete power plate

House № 10
1. Arrangement of the pit under the pile field
2. Arrangement of a pile field by pressing fields

    House № 9
1. Geodetic breakdown of the boundaries for the installation of a ditch
2. Arrangement of the pit under the pile field

Residential quarter of the 1st stage
1. Geodetic layout of the route for the arrangement of external networks
2. Removal of the vegetation layer for the arrangement of external networks
3. Installation of the trough for external networks
4. Storage of pipes of external networks f 225,110,250,400
5. Arrangement of access roads, installation of road plates
6. Dismantling and installation of temporary protection from the construction site decking
7. Installation of concrete pavement for investors

×