The performance of the residential complex “Forest Fairy tale-2” in May 2019

House number 4 - Installation of ventilation ducts: Section №3 -3rd floor - roof - Rainwater drainage system - Section No. 1,2 - Installation of insulation and waterproofing of the roof - Section №2House number 3- Arrangement of monolithic b / w input groups and pits: Section №1, №2 - 58 m3 - Construction of the facade of the building has begunHouse number 2 - Installation of metal-plastic window constructions of the 4th and 5th floors - Section №1 - Brick masonry of walls and partitions. Section number 1, floors: 6 - Brick masonry of walls and partitions. Section number 3, floors: 6 - Arrangement of partitions made of gypsum paving slabs. Section number 1, floors: 5,6 - Installation of a monolithic belt for the installation of aluminum stained-glass windows of the 6th floor - Section №2House number 1 - Development of foundation pile foundation - Section №2 - Arrangement of vertical I / S structures of the 2nd floor - Section №1 - Arrangement of a / b floor slab of the 2nd floor (2/3 of the area of ​​the plate) - Section №1 - Arrangement of vertical I / S structures of the 3rd floor - Section №1

×