Execution of works for May 2019 of «Royal Park» of Irpin, Soborna 151, 151a, 151b.

Section number 3
- Installation of a monolithic roof parapet
- Installation of smoke exhaust channels: 4th floor
- Installation of ventilation ducts: 3rd-4th floors
- Arrangement of partitions from gypsum paving slabs: 4th floor
- Brick masonry of walls and partitions of bathrooms 4th, 5th floors
- Installation of metal-plastic window constructions of the 7th and 8th floors
- Installation of aluminum constructions on the 1st and 2nd floors
- Installation of partitions with 2NF on the 11th floor

Section number 2
- Arrangement of vertical monolithic structures on the 11th floor
- Arrangement of a monolithic overlay on the 11th floor
- Arrangement of vertical monolithic structures on the 12th floor
- Arrangement of a monolithic ceiling of the 12th floor
- Installation of a monolithic roof parapet
- Installation of smoke exhaust channels: 7th floor
- Installation of ventilation ducts: 6th floor
- Installation of aluminum constructions on the 1st and 2nd floors
- Installation of external walls and partitions with 2NF on the 9th floor

Section number 1
- Arrangement of vertical monolithic parking designs
- Parking monolithic overlays
- Arrangement of vertical monolithic structures on the 1st floor
- Arrangement of a monolithic floor covering on the 1st floor

×