Execution of works for May 2019 «Najkrashhij Kvartal» Irpen, street. Lomonosov

House number 1.
1. Arrangement of partitions from gypsum plasterboard plates. Floors 2.3.
2. Installation of waterproofing and insulation of the walls of the ground floor.
3. Arrangement of a monolithic b / w of the input group.

   House number 2.
1. Installation of the waterproofing of the roof.
2. Installation of waterproofing and insulation of the walls of the ground floor.
3. Arrangement of a monolithic b / w of the input group.
4. Execution of electrical works.

House number 3.
1. Arrangement of partitions from gypsum plasterboard plates. Floor 3
2. The arrangement of the inclined layers of the roof.
3. Facade building.

House number 4.
1. Arrangement of partitions from gypsum plasterboard plates. Floor 3
2. Installation of brick partitions on the ground floor.
3. The arrangement of metal-plastic window constructions. Floor 3
4. Installation of the inclined layers of the roof.
5. Facade building.

House number 5.
1. Arrangement of partitions from gypsum plasterboard plates. Floors 2.3.
2. Installation of brick partitions on the ground floor.
3. The arrangement of metal-plastic window constructions. Floor 1,2,3.

Buildings number 6 and number 7.
1. Installation of brickwork on the 3rd floor.
2. Positioning of the ceiling of the 3rd floor.
3. Installation of brick parapets.
4. Arrangement of partitions made of gypsum paving slabs. Floor 2

  Buildings # 8 and # 9.
1. Installation of brickwork on the 2nd floor.

Buildings No. 10 and No. 11.
1. Installation of brickwork and partition walls of the ground floor.
Buildings No. 12 and No. 13.
1. Arrangement of backfilling of b / w razverk.

House number 14.
1. Installation of b / w razverk.

×