House №1
1. Installation of stained glass fencing of the first and second floors.
2. Installation of aluminum frame for staircase fencing of entrance group.
Houses №2 and №3
1. Installation of aluminum frame for staircase fencing of entrance groups.
House №4
1. Installation of ceramic tiles in the MZK floor.
2. Installation of laundry rails on terracesHouse №6
1. Insulation of a fragment of a facade of the house.
2. Construction works for the plumbing networks of the 1st and 2nd floors.
House №7
1. Plastering the walls of the second floor.
2. Arrangement of the entrance group of the basement floor.
House №8
1. Arrangement of a brickwork and a monolithic covering of an entrance group.
House №10
1. Setting up smoke channels.
Houses №11, №12 and №13
1. Arrangement of the third floor overlap.
2. Arrangement of brick laying of railings.
House №14
1. Arrangement of the ceiling of the basement floor.
2. Arrangement of the brickwork of the first floor.
House №15
1. Arrangement of the brickwork of the first floor.
House №16
1. Arrangement of a monolithic reinforcement belt on the walls of the basement floorHouse №17
1. Installation of the basement blocks of the basement floor.
Houses №19-23
1. Arranging the base under the pile field.
Installation of external sewerage networks of 5-7 houses.
Installation of external power supply networks of 5-7 houses.