Works for February 2020. Residential Complex «Na Proreznoy-2»

House №1 Section №1
1. Rooftop Arrangement.
2. Arrangement of masonry block 7 floor.
3. Laying the masonry block 8 floor.
4. Arrangement of the ventilation units 6,7,8 floor and on the roof


House №1 Section №2
1. Installation of windows 2-5 floor.
2. Arrangement of masonry block 7 floor.
3. Laying the masonry block 8 floor.
4. Arrangement of partitions with GWP 6 floor.
5. Arrangement of partitions with PGP 7 floor.
6. Arrangement of partitions with GWP 8 floor


House №1 Section №3
1. Arrangement of floor slabs 1 floor.
2. Arrangement of vertical elements 2 floors.
3. Arrangement of floor slabs 2 floors.
4. Arrangement of vertical elements of 3 floors.

House №2 Section №3
1. Arrangement of vertical elements of the basement floor.
2. Arrangement of the floor slab of the basement floor.

×