The course of construction of RC “Najkrashhij Kvartal” for September 2019.

House # 2.
1. Decorating common areas.
2. Installation of cement screed for commercial premises.
3. Insulation and installation of cement screed with concrete cover of entrance group.

House # 3.
1. Decorating common areas.
2. Installation of cement screed for commercial premises.
3. Insulation and installation of cement screed with concrete cover of entrance group.

House # 4.
1. Decorating common areas.
2. Installation of cement screed for commercial premises.
3. Arrangement of metal balconies of balconies.
4. Performing works on the installation of plumbing on the 3rd floor.
5. Insulation and Cementing of Terraces and Balconies


House # 5.
1. Arrangement of plaster walls of 1st, 2nd, 3rd floors.
2. Bathroom floor waterproofing.

Houses # 6 and # 7.
1. Arrangement of insulating, sloping roof layer.
2. Insulation and installation of cement screed with concrete cover of entrance group.
3. Arrangement of waterproofing and insulation of basement walls.

Houses # 8, # 9.
1. Arrangement of overlapping of the 3rd floor.
2. Arrangement of brick laying of railings.

Houses # 12 and # 13.
1. Arrangement of horizontal waterproofing and floor slab slabs.

Houses # 14 and # 15.
1. Installation of foundation blocks installation.

House # 16.
1. Arrangement of horizontal waterproofing on the concrete slab of the grid.

×