Comfort LifeAll newsCourse of constructionConstruction progress for the Riverside residential complex in August – September

We build a comfortable life

0
1
2
3
4
5
6
7

Construction progress for the Riverside residential complex in August – September

Residential building No. 1 section 1
1. The device of monolithic reinforced concrete floors of the 5th floor
2. The device of vertical reinforced concrete structures of the 6th floor
3. The device of monolithic reinforced concrete floors of the 6th floor
4. Installation of flights of stairs to elev. +14,600 (4pcs)
5. Arrangement of monolithic reinforced concrete staircases and platforms up to elevation, + 22,200
6. The device of vertical reinforced concrete structures of the 7th floor
7. Brickwork of the external and internal walls of the 1st floor
8. Brickwork of external and internal walls of 2 floors
9. Brickwork of external and internal walls of 3 floors
10. Brickwork of external and internal walls of 4 floors
11. Brickwork of external and internal walls of the 5th floor
12. Installation of window frames 2nd floor
13. Installation of window frames 3rd floor

Residential Building # 1 Section 2
1. The device of vertical reinforced concrete structures 4 floors
2. The device of a monolithic reinforced concrete floor 4 floors
3. The device of monolithic reinforced concrete parapets
4. Installation of prefabricated ventilation units 100%
5. Installation of window frames 1st floor
6. Installation of window frames 2nd floor
7. Installation of window frames 3rd floor
8. Installation of window frames 4th floor
9. Brickwork of external and internal walls 1-4 floors
10. Installation of flights of stairs to elev. +11.300 (7 pcs)

Landscaping between train 1 and the channel
1. Backfill the basement walls with soil
2. Cleaning the coast of the canal from the vegetation layer
3. Vertical layout of soil for landscaping

Residential Building # 2 Section 4 (16)
1. The device of a monolithic reinforced concrete floor of the 1st floor
2. The device of vertical reinforced concrete structures 2 floors
3. The device of monolithic reinforced concrete floors 2 floors
4. Arrangement of vertical reinforced concrete structures 3 floors
5. The device of a monolithic reinforced concrete floor 4 floors
6. The device of vertical reinforced concrete structures of the 5th floor
7. Brickwork of the external and internal walls of the 1st floor

Residential Building # 2 Section 3 (15)
1. Arrangement of vertical reinforced concrete basement structures
2. The device of a monolithic reinforced concrete floor of the 1st floor
3. Arrangement of vertical reinforced concrete structures 2 floors
4. The device of a monolithic reinforced concrete floor 2 floors
5. Arrangement of vertical reinforced concrete structures 3 floors

Residential building No. 8 of section 26-28
1. The device of the pressed in piles 334 pieces of 100%
2. Installation of monolithic reinforced concrete foundations of section 3
3. Pit device by excavator CAT 434 F2 section 2

First Stage Residential Complex
1. Installation of access roads САТ 434, installation of road plates
2. Dismantling and installation of temporary fencing from the professional flooring of the construction site

×